Crane system relocation, Bosch
2025
In a Bosch production hall, we relocated two crane systems: a vacuum lifter and a travelling-trolley crane. We dismantled the structures for transport and cut the old anchor bolts flush with the floor. At the new location beside the production line, we installed M24 and M18 threaded rods in drilled floor holes using chemical anchors, then lifted and secured the cranes. The work followed site requirements, a job safety analysis (JSA) and a contractor work permit.
Press maintenance
2024
During a summer shutdown, our team carried out comprehensive maintenance and major unit replacement on a 1,200-tonne hydraulic press. The main drive motor was removed and the replacement lifted and positioned with an industrial crane. New control cabinets were installed and connected. Power and control wiring was rebuilt in accordance with marking and documentation requirements. Hydraulic work included oil, filter and seal replacement, pressure testing and leak testing. Trial operation and calibration followed the manufacturer's requirements, with all operating parameters meeting expectations. The equipment was handed over safely, on time and with complete documentation.
Conveyor installation
2024
For an automotive supplier, we installed a new 24-metre steel-frame conveyor for production line material handling. After dismantling the old conveyor, we levelled the new supports and structural elements to ±2 mm. Wiring and controls were rebuilt for the system's 7.5 kW variable-frequency drive, including emergency stops and safety sensors. The conveyor ran without faults during trial operation and met the manufacturer's parameters. It was handed over on time, ready for operation.
Cleanroom laboratory construction
2024
As part of an automotive plant expansion, we helped create a cleanroom laboratory. The scope included wall and ceiling panels, lighting and electrical work, and installation and connection of extraction, nitrogen, water, drainage and compressed air networks. Utilities were coordinated with the laboratory's ventilation and operating environment. Construction, cleaning and final testing responsibilities must be defined in the project's technical scope.
Injection moulding machine installation
2024
For a plant capacity expansion, we carried out the lifting, internal handling and installation of a 60-tonne injection moulding machine. A 20-tonne gantry crane and hydraulic lifting system were used to position the equipment on its designated base plate with millimetre precision. Mechanical fixing, water, cooling and electrical connections, and hydraulic and pneumatic connections followed the manufacturer's requirements. Levelling, pressure testing and functional testing confirmed the operating requirements. The equipment was handed over safely, on time and with documentation.
Component manufacturing since 2020
Working closely with our customers' engineers, we manufacture components for production and maintenance, tailoring technical solutions to their needs. Our work includes design, machining and assembly of one-off and small-batch components, as well as development and manufacture of automated special-purpose machinery for high-volume production. We use 3D design, CNC machining, welding and final inspection to support accuracy and reliability. Machines and components are manufactured and commissioned in accordance with the customer's process and quality requirements.
Special-purpose machinery manufacturing
We design and manufacture special-purpose machinery, assembly and clamping fixtures, positioners and production aids. The product, operator tasks, available space and acceptance requirements are agreed together. Mechanical, pneumatic and control engineering tasks are adapted to the scope. Risk assessment, conformity assessment and documentation requirements are determined for the specific equipment.
Industrial cleaning
We clean manufacturing plants, machinery, hall structures and process systems. Access, surfaces, contamination and site work rules are agreed in advance. The scope may include cleanroom cleaning, work at height, chemical cleaning or high-pressure cleaning. Methods and equipment are selected for the actual requirements; inspection points and handover documentation are defined in the quotation.
Maintenance
We provide planned and corrective maintenance, repairs, component replacement and refurbishment of production equipment. Work is prepared through a condition survey, parts preparation and an agreed shutdown plan. Machine service records can document faults, interventions, fitted parts and inspections. Routine maintenance schedules are aligned with the manufacturer's instructions, usage and the customer's production schedule.